G.R. BIRDWELL CONSTRUCTION

  1. Home
  2. Applied Innovations
  3. G.R. BIRDWELL CONSTRUCTION

THE SITUATION

The G.R. Birdwell Construction company in Texas required a heavy-duty Drive-Over Spill Containment Berm system (Secondary Containment Berm) for a new bulk liquid container facility that was taller than our current 2” Berm Bump. They also wanted a 4” high berm to contain the waste water in the same area.

LOCATION:
TEXAS

CLIENT:
G.R. BIRDWELL CONSTRUCTION

PRODUCTS USED:
3″ HIGH DRIVE-OVER SPILL CONTAINMENT BERM

APPLICATION:
INDUSTRIAL

THE PROBLEM

The engineers at G.R. Birdwell Construction required an easily installed drive-over berm system that was taller than 2”, more durable than foam filled berms or temporary short-term berm solutions and much easier to install than concrete.

RUBBERFORM INNOVATION

RubberForm worked with the Engineers at the G.R. Birdwell Construction and proposed a 3” high drive-over Spill Containment Berm along with our 4” high, chemical resistant EPDM solid rubber Secondary Containment Berm. RubberForm modified it’s 4” Speed Bump to a 3” tall solid molded, durable Spill Berm. This gave RubberForm 2 new solutions: a 3” high Drive-Over Containment Berm and a 3” high Speed Bump to be added to RubberForm’s American-made recycled material product offerings.

THE OUTCOME

A successful installation by G.R. Birdwell Construction where they installed our modified 4” Speed Bump to a 3” tall drive-over spill containment berm for heavy axles tow motors and other heavy trucks. G.R. Birdwell along with their bulk container customer are very pleased with the outcome – it’s been so successful that G.R. Birdwell has installed it numerous times.

VIEW MORE APPLIED INNOVATIONS

LOGIC PACKAGING

LOGIC PACKAGING

THE SITUATION Logic Packaging, a comprehensive engineering consultant group needed to secure pump housing so they wouldn’t get scratched and damaged during transportation.LOCATION: FOUNTAIN INN, SOUTH CAROLINACLIENT: LOGIC PACKAGINGPRODUCTS USED: EXTRUDED RIBBED WEDGE...

read more
SANTA CLARA VALLEY TRANSPORTATION AUTHORITY (VTA)

SANTA CLARA VALLEY TRANSPORTATION AUTHORITY (VTA)

THE SITUATION The Santa Clara Valley Transportation Authority (VTA) needed a quick deployable passenger cueing system to direct mass transit riders to the specific trains for the new Levi Stadium in Santa Clara, California, the home of the San Francisco...

read more
Metropolitan Airport Authority Of Peoria

Metropolitan Airport Authority Of Peoria

THE SITUATION The Metropolitan Airport Authority of Peoria (MAAP) needed and improved and sustainable solution for designating parking lot aisles and parking spots at car rental airport locations.LOCATION:PEORIA, ILLINOISCLIENT:METROPOLITAN AIRPORT AUTHORITY OF...

read more